Virginia Master Plumber Exam Preparation

Prepare and study for your state Master Plumber examination in the comfort of your home.

Original price was: $995.00.Current price is: $495.00.

Confirm your State before the Purchase

Our Virginia Master Plumber practice exams simulate the experience of taking the computerized state examination. Our online class will teach you how to pass the Master Plumber Test.

Ready to enroll or have questions? Please contact Daniela Gonzalez (303) 916-0020, or click Add to Cart

Virginia Master Plumber Exam Preparation is our specialty since 1972. School enrollment is complete with Home Study Computer Program, Tutoring, and Live Seminars with real questions, answers, code references, and calculations to prepare you for the actual PSI state licensing exam.

Candidates for state licensure must now pass an exam administered by PSI prior to submitting an application for licensure. See the recommended steps listed below:

    1. Study to pass your state exam on the first try with our Home Study Computer Program (Click ADD TO CART above)
    2. Register to take your exam online at www.psiexams.com or call (855) 898-0710
    3. Schedule an appointment to take the examination with PSI
    4. Take and pass the state exam
      • You must bring two valid forms of identification
      • Arrive 30 minutes prior to the scheduled examination appointment.
    5. File a license application with the Board

 

Why Wait? Call Daniela Today! (303) 916-0020

 

Below are a few questions from your upcoming PSI state exam:

(1) How many DFUs are permitted to be added to an apartment building with an existing 1,200 DFUs already installed? Assume the building drainage piping is 8-inch diameter at slope of 1/8″ per foot?

      • IPC – TABLE 710.1(1) Row for DIAMETER OF PIPE (inches) “8 inches”, Column for DIAMETER OF PIPE (inches) 1/8-inch Slope per foot lists “1,600” DFUs. Therefore, subtract; Allowable = 1,600 – 1,200 DFUs = 400 DFUs

(2) Where smoke is utilized for drainage and vent final test of a plumbing system, it shall be made by filling all traps with water and then introducing into the entire system a pungent, thick smoke produced by one or more smoke machines. When the smoke appears at stack openings on the roof, the stack openings shall be closed and a pressure equivalent to?

      • Correct Answer: IPC – 312.4, pressure equivalent to a “1-inch water column” shall be held for a test period of not less than 15 minutes.

(3) According to the IPC, cast-iron pipe must be supported by hangers at a maximum interval of how many feet between the hangers if vertically installed?

      • Correct Answer: IPC – Table 308.5, 15 feet.
 

  • International Plumbing Code
  • International Residential Building Code

Testimonials