New Mexico Heat, Cool, and Process Pipe Contractor with Business Law Exam Preparation

Prepare and study for your state Heat, Cool, and Process Pipe Contractor with Business Law examination in the comfort of your home.

Original price was: $995.00.Current price is: $795.00.

Please confirm your state before the purchase.

Our New Mexico Heat, Cool, and Process Pipe Contractor with Business Law practice exams simulate the experience of taking the computerized state examination. Our online class will teach you how to pass the Heat, Cool, and Process Pipe Contractor with Business Law Test.

Don't miss out on this opportunity for growth and expertise. Join our industry-leading courses and pave your path to success.

Process Pipe Contractor (MM4) Candidates, this new program has four practice tests with over 250 questions that simulate your state exam. Questions, answers, and article references that you need to pass the new PSI state examination are contained in this module. Choose this program if you are serious about passing your state exam with PSI. Go into the test prepared with the best computer study program in New Mexico !!!

Our Heat, Cool, and Process Pipe Contractor (MM-4) software is an interactive program that allows each license candidate to prepare and study for his state examination while in the comfort of his own home. Our practice exams actually simulate the experience of taking the computerized state examination. The questions, answers, and article references have been professionally prepared by our research team to cover every subject area, code section, and calculations. The combination of specific computer based training with our software, familiarity with the code book, and your years of field experience assure your success. Prep At Home today!

The following reference materials are allowed in the examination center:

  • Uniform Mechanical Code, 2009, International Association of Plumbing and Mechanical Officials (IAPMO), (800) 854-2766. www.iapmo.org.
  • Modern Refrigeration and Air Conditioning, 2004, 18th Edition. The Goodheart-Willcox Company, (800) 323-0440. www.goodheartwillcox.com
  • IPTs Pipe Trades Handbook, Robert A. Lee, 1991, IPT Publishing and Training, Ltd., ISBN 0-920855-18-0. (888) 808-6763. www.iptbooks.com.
  • NFPA 13 Installation of Sprinkler Systems, 2007, National Fire Protection Association (NFPA), (800) 344-3555,www.nfpa.org.
  • NFPA 17 Standard for Dry Chemical Extinguishing Systems, 2009, National Fire Protection Association (NFPA),(800) 344-3555, www.nfpa.org.
  • New Mexico Mechanical Code (NMAC 14.9.2), 2009. (505) 476-4700. www.nmcpr.state.nm.us/NMAC.
  • New Mexico Boiler Rules and Regulations (NMAC 14.9.4), 2005. (505) 476-4700. www.nmcpr.state.nm.us/NMAC.

Important Notes:

  • Candidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined and/or indexed prior to the examination session. (Permanent tabs and highlighting is permitted. No notes !!!)

Application for State Licensing must be submitted to PSI:

PSI Services LLC
2301 Yale SE, Ste. C-4
Albuquerque, NM87106
Phone: (877) 663?9276
Web Site: public.psiexams.com

  • License candidates must be pre-approved by Construction Industries prior to testing with PSI.
  • Applications submitted to PSI are usually processed in 2-3 weeks, at which time PSI will mail each license candidate a letter or postcard to indicate approval to take the examination.

Examinations are administered by PSI:

PSI Services LLC
3210 E. Tropicana, Las Vegas, NV 89121
Phone: (800) 733-9267
Web Site: www.psiexams.com

  • Be sure to carefully review your Candidate Information bulletin prior to your examination. This document contains important information regarding testing locations, fees, dates, examination content and reference materials used to make the examination.

Here is a small sample of our exam prep questions:

  • A gas monitoring system shall be installed when dispensing occurs and flammable gases may be present in excess of ___ of the lower explosive limit? Answer: 20 percent. Reference: add article here.
  • Where is the low-pressure liquid refrigerant located in an industrial chiller?Answer: Evaporator. Reference: Modern Refrigeration and Air Conditioning, 2004, page 951.
  • The most common length for steel pipe that is 8 inches or smaller in diameter is ___?
    Answer: 21 foot lengths. Reference: IPT Pipe Trades Handbook 1991, page 46.
  • Uniform Mechanical Code, 2009

  • Modern Refrigeration and Air Conditioning, 2004, 18th Edition.

  • IPTs Pipe Trades Handbook, Robert A. Lee, 1991

  • NFPA 13 Installation of Sprinkler Systems, 2007

License Requirements Summary:

  • 90 question exam, 220 minute time limit, minimum test score 75%
  • State Application Fee = $36.00
  • PSI Test Fee=$68.88
  • Experience requirement: 4 years.

Testimonials